The new pharmaceutical chemical production facility expanded existing capacity and was based on a batch organic process with built-in flexibility to handle a wide range of corrosive and toxic subtances.

CEL responsibilities

  • Design and engineering
  • Project and construction management
  • Commissioning

Key features

  • Advanced DCS computer control providing accuracy, repeatability and security
  • Designed for easy cleaning and rapid changeover
  • Construction alongside existing operating units
  • 104 tie-ins to existing process over four-day shutdown
  • No lost time in production
  • Total containment